One definition for everything
Fuuz became the golden record: a work order, a job order and a production order are the same thing in one data model.
Customer story · Automotive Tier 1
A global Tier 1 automotive supplier, with some aerospace and defense work, replaced Boomi with Fuuz across more than 160 integrations. In six months Fuuz became the system of record across more than 30 siloed systems, including multiple ERPs, HCM, PLM and operations systems.
The challenge
They did not come to Fuuz for MES or WMS. They needed the business to have one definition for everything: a work order, a job order and a production order had to mean the same thing, wherever the work happened.
What they built on Fuuz
Fuuz became the golden record: a work order, a job order and a production order are the same thing in one data model.
Boomi was replaced by Fuuz data flows connecting ERPs, HCM, PLM and operations systems.
Teams built operational apps on Fuuz instead of using the legacy tools native to each ERP ecosystem.
Product engineers ask Claude for an item by attributes and ranges, and get a list of candidates from the Fuuz data model.
The entire launch project runs in Fuuz: notifications, alerts, triggers, PLM integrations and feedback loops to supply chain in procurement software and ERP systems.
Manufacturing BOM development moved from weeks to days or less in most cases.
By the numbers
160+
Integrations
Moved from an existing integration tool to Fuuz.
30+
Siloed systems
Multiple ERPs, HCM, PLM and operations systems, with Fuuz as the system of record.
About 4 weeks
To building apps
Teams learned one tool and began replacing what they had built before.
How it unfolded
First
Took ownership of the platform first.
Then
Took ownership next.
Then
Built on Fuuz instead of the legacy tools native to each ERP ecosystem.
Result
The business was prepared for global ERP standardization to a clean core.
Results
Fuuz is the golden record, so the same thing means the same thing in every system and every country.
The business could identify its needs quickly and address them even faster in Fuuz, which opened the pathway to standardizing its ERPs globally on a clean core.
Finding a clip, fastener or widget no longer means looking in 12 systems. Engineers ask Claude and Fuuz returns candidates.
Manufacturing BOM development dropped from weeks to days or less in most cases.
Design-to-production BOM time for plant-level pilots and PTRs, historically about five months, came down to a few weeks.
Teams learned one tool in about four weeks and began building apps that replaced what they had built before.
How Tier 1 suppliers use Fuuz.
Learn moreConnect every ERP and the systems around it.
Learn moreExtend the ERP without customizing it.
Learn moreGet started
Tell us what you run today and what you need next. We will map how Fuuz fits, without ripping anything out.
Prefer to talk? Call 1-877-801-FUUZ (3889)