# Global Tier 1 Automotive Supplier

> A global Tier 1 automotive supplier replaced Boomi with Fuuz across 160+ integrations, and made Fuuz the system of record across 30+ systems in six months.

Source: https://www.fuuz.com/customers/global-tier-1-golden-record

Customer story · Automotive Tier 1


A global Tier 1 automotive supplier, with some aerospace and defense work, replaced Boomi with Fuuz across more than 160 integrations. In six months Fuuz became the system of record across more than 30 siloed systems, including multiple ERPs, HCM, PLM and operations systems.

[Design a solution](https://www.fuuz.com/contact) [All customer stories](https://www.fuuz.com/customers/)

At a glance

- **Industry** Automotive Tier 1, with limited aerospace and defense
- **Company** Name withheld at the customer's request
- **Footprint** 40+ sites worldwide, including France, Germany, the Czech Republic, Mexico, Spain, China and the US
- **Replaced** Boomi, across 160+ integrations
- **Time to system of record** Six months, across 30+ systems
The challenge

## Where They Started

They did not come to Fuuz for MES or WMS. They needed the business to have one definition for everything: a work order, a job order and a production order had to mean the same thing, wherever the work happened.

- More than 30 siloed systems, including multiple ERPs, HCM, PLM and operations systems
- ERPs from Oracle, Plex, QAD, SAP ECC and Infor to AS/400s, across France, Germany, the Czech Republic, Mexico, Spain, China and the US
- Over 160 integrations on an existing integration tool
- The same thing called a work order, a job order or a production order, depending on the system
- Product engineers who could not find a clip, fastener or widget across 40+ sites without looking in 12 different systems
- A plan to standardize the ERPs globally on a clean core, which meant knowing exactly what the business needed
What they built on Fuuz

## A Golden Record Across The Business

### One definition for everything

Fuuz became the golden record: a work order, a job order and a production order are the same thing in one data model.

### 160+ integrations on Fuuz

Boomi was replaced by Fuuz data flows connecting ERPs, HCM, PLM and operations systems.

### Operational apps on the platform

Teams built operational apps on Fuuz instead of using the legacy tools native to each ERP ecosystem.

### Part search with Claude

Product engineers ask Claude for an item by attributes and ranges, and get a list of candidates from the Fuuz data model.

### Launch management in one place

The entire launch project runs in Fuuz: notifications, alerts, triggers, PLM integrations and feedback loops to supply chain in procurement software and ERP systems.

### Manufacturing BOMs, faster

Manufacturing BOM development moved from weeks to days or less in most cases.

By the numbers

## Six Months To System Of Record

160+

Integrations

Moved from an existing integration tool to Fuuz.

30+

Siloed systems

Multiple ERPs, HCM, PLM and operations systems, with Fuuz as the system of record.

About 4 weeks

To building apps

Teams learned one tool and began replacing what they had built before.

How it unfolded

## From The Data Team To Operational Apps

First

### The internal data team

Took ownership of the platform first.

Then

### The application team in India

Took ownership next.

Then

### Operational apps

Built on Fuuz instead of the legacy tools native to each ERP ecosystem.

Result

### Ready for clean core

The business was prepared for global ERP standardization to a clean core.

Results

## What Changed

### One definition across the business

Fuuz is the golden record, so the same thing means the same thing in every system and every country.

### A pathway to clean core

The business could identify its needs quickly and address them even faster in Fuuz, which opened the pathway to standardizing its ERPs globally on a clean core.

### Search 40+ sites in one place

Finding a clip, fastener or widget no longer means looking in 12 systems. Engineers ask Claude and Fuuz returns candidates.

### Weeks to days

Manufacturing BOM development dropped from weeks to days or less in most cases.

### Five months to a few weeks

Design-to-production BOM time for plant-level pilots and PTRs, historically about five months, came down to a few weeks.

### One tool, learned in weeks

Teams learned one tool in about four weeks and began building apps that replaced what they had built before.

## Related

### Automotive

How Tier 1 suppliers use Fuuz.

[Learn more →](https://www.fuuz.com/industries/automotive)

### ERP integration

Connect every ERP and the systems around it.

[Learn more →](https://www.fuuz.com/solutions/erp-integration)

### ERP extension

Extend the ERP without customizing it.

[Learn more →](https://www.fuuz.com/solutions/erp-extension)

Get started

## Write Your Own Story.

Tell us what you run today and what you need next. We will map how Fuuz fits, without ripping anything out.

[Start the conversation](https://www.fuuz.com/contact)

Prefer to talk? Call [1-877-801-FUUZ (3889)](tel:18778013889)
